Quncheng Automation
Evaporator Blockage and Capillary Flow Testing

Inspection & Laboratory Systems · HVAC

Evaporator Blockage and Capillary Flow Testing

Automatic detection of blockage, flow deviation and assembly anomalies in evaporators and capillary tubes.
PROJECT TYPEInspection & Laboratory SystemsINDUSTRYHVACENGINEERING FOCUSRefrigeration circuit · Component testing
01 · PROJECT PROFILE

Application and system boundary

Application

Automatic detection of blockage, flow deviation and assembly anomalies in evaporators and capillary tubes.

Main scope

Evaporator blockage test · Capillary flow test · Flow-deviation judgement · Assembly anomaly detection · In-line or laboratory setup

02 · SYSTEM SCOPE

Test items and equipment scope

The scope below is taken from the public project material and organized around the product process, test object or data path.

01Evaporator blockage test

Test item / equipment module

02Capillary flow test

Test item / equipment module

03Flow-deviation judgement

Test item / equipment module

04Assembly anomaly detection

Test item / equipment module

05In-line or laboratory setup

Test item / equipment module

03 · TECHNICAL PROFILE

Configuration and verified project information

01Evaporator sizesØ5 / Ø7 / Ø9 mm; 4-in/4-out or 6-in/6-out
02Evaporator accuracy0.1% FS
03Single-tube blockage detection≥99.99%
04Capillary maximum flow200 L/min
05Capillary maximum pressure0.7 MPa
06ConfigurationLaboratory or in-line testing
04 · PROJECT EVIDENCE

Equipment, stations and system views

Available visuals show the complete line, key stations, equipment configuration, dashboards or operating video associated with this project.

HVAC Component Testing — project view 1
HVAC Component Testing — project view 1
HVAC Component Testing — project view 2
HVAC Component Testing — project view 2
DISCUSS A SIMILAR PROJECT

Start with your product, process and verification target

Share the product structure, target takt, test requirements, site layout and required interfaces. We will define the corresponding solution boundary.

Discuss project requirements →