Quncheng Automation
DELIVERY & SERVICE

Turn a complex project
into a stable operating system

Delivery extends beyond equipment arrival. We manage the full path from requirements and engineering validation to manufacturing, FAT, installation, SAT, training and production ramp-up.

DELIVERY TARGETVerifiableTraceableProduction-ready

FAT, SAT and service scope are executed against the project contract and mutually approved documents.

PROJECT PATH

Six stages under one delivery baseline

Each stage has defined inputs, outputs and verification actions to prevent gaps between disciplines and project phases.

01

Requirements & Boundary

Confirm product, process, takt, test standards, interfaces and acceptance criteria.

02

Solution & Risk

Define system architecture, station boundaries, key mechanisms and control strategy; identify cycle-time and interference risks.

03

Design & Review

Coordinate mechanical, electrical, software, vision and data design through cross-disciplinary reviews.

04

Manufacturing & Integration

Complete fabrication, assembly, wiring and software integration in controlled modules.

05

Factory Acceptance Test

Verify function, performance, safety and continuous operation against the agreed FAT checklist.

06

Installation & Production

Complete installation, commissioning, SAT, training and production ramp-up support.

QUALITY GATES

Verify critical points before moving forward

Technical baselines and quality gates expose issues affecting function, takt, safety and production launch as early as possible.

01

Technical baseline

Requirements, standards, interfaces and versions remain controlled.

02

Cross-disciplinary review

Process, mechanical, electrical, software and vision teams verify key decisions together.

03

Layered verification

Testing proceeds from machine and cell level to the complete integrated line.

04

Issue closure

Ownership, action, verification evidence and closure status remain traceable.

DELIVERY PACKAGE

Documentation and training for continued operation

Depending on project scope, we provide operating and safety instructions, maintenance guidance, drawings, program backups, test records, acceptance documents and role-based training.

  • Operation and safety instructions
  • Maintenance and spare-part guidance
  • Electrical drawings and program backups
  • Test and acceptance records
  • On-site training and handover
  • Service boundary and response mechanism
START WITH A CLEAR BASELINE

Define the target, boundary and verification method first

Start a project conversation →